Skip to content

Horizontal Pre-Bent S Curve Monorail

Available Stock:
: :
SKU 700MOBHSC60BRZ
Original price $325.00 - Original price $357.50
Original price
$325.00
$325.00 - $357.50
Current price $325.00

Achieve a clean, modern lighting line with the Horizontal Pre-Bent S Curve Monorail. Engineered to follow a graceful S-curve, it delivers a seamless, designer-ready trace for contemporary spaces. Built for professional-grade installations that still feel approachable.

  • Pre-bent horizontal S-curve design for a dramatic, continuous light path without visible joints.
  • Compact profile with a width of 0.30" and height of 0.60" for low-profile installations.
  • Lightweight and durable at 1.10 lb, built to endure daily use.
  • Includes the monorail segment necessary for quick, straightforward installation.
  • Versatile finish options coordinate with bronze/dark, pewter, nickel, or silver tones.

Sizing note: Designed for standard track configurations; measure your ceiling clearance to ensure a precise fit in your space.

Ships quickly and is eligible for hassle-free returns within 30 days.

Easy Returns & Exchanges

We believe shopping for lighting should be inspiring and low-stress.

Free Shipping

Enjoy free shipping to the USA on your order of $50 or more

Live Customer Service

Let's prepare your order together. We're online during normal business hours.

Compare products

{"one"=>"Select 2 or 3 items to compare", "other"=>"{{ count }} of 3 items selected"}

Select first item to compare

Select second item to compare

Select third item to compare

Compare